Description
I have been working within the Oil & Gas industry in the field of electrical maintenance, instrumentation, and control for more than seven years.
Education
- Universidad Tecnológica Nacional de Buenos Aires 2019
Diploma in Project Management
It complements a degree training to be able to work in the field of project management, as directors, Project office managers (PMO), independent consultants, project managers, or any other function linked to executive and advisory positions within the broad Project Management field
- Universidad Austral 2018
Diploma in Asset and Maintenance Management
Diploma aimed at developing the necessary skills for effective maintenance management, organization and planning.
- Universidad Nacional de Mar del Plata 2014
MSc in Electronics Engineering
Engineer\'s degree - Electrical and Electronics Engineering
Experience
- Hoerbiger 2019 - Present
Head of Instrumentation and Control (Compression)
• Troubleshooting, testing, assembly, and visual inspection of equipment • Ensuring continuous improvement of the fleet maintenance strategy, including root-cause analysis and follow-up • Heading up and supporting a dedicated team of multi-skilled engineers and technician • Spare parts and maintenance routines management • KPI reporting to the regional upper management • Equipment Pre-Comm and Comm • Development and implementation of equipment improvements (hardware and software) • Telemetry system surveillance (Modbus, GPRS, Satellite)Key Achievements: 7+ equipment Pre-Comm and Comm in the last year; more than 450 hours of training given to field personnel; telemetry system improvements resulting in a 35% downtime reduction. https://www.hoerbiger.com/
- San Antonio Internacional 2014 - 2019
Head of Maintenance (Oil&Gas Drilling)
• In charge of availability, reliability, and continuous improvement of electro-hydraulic drilling rigs • Mechanical and electrical maintenance crews’ supervisor • Crucial spare parts management • Building and implementing maintenance programs • Regional technical focal point of electrical and mechanical drilling rigs maintenance. • Root cause analysis and reporting (Internal and to the Customer)Key Achievements: 1500+ critical spare parts management. Up to 14 persons in charge between technicians and supervisors. 24-7 reliability guaranteed with minimum downtime hours in five years. http://www.sanantoniointernacional.com/
- Scientific Research Commission 2013 - 2014
Internship (Part-Time)
• Development of an automatic measurement system (thesis): o Component selection o PCB Design and Construction (Ares – Proteus) o Components assembly o Circuit debugging o Device programming (C Language) • Device deployment and testing. Key Achievements: Development and build of a fully operational control device.https://www.cic.gba.gob.ar/
- Digimage Naval Electronics - Oct 2013 – Apr 2014 2013 - 2014
Equipment Maintenance Engineer (Part-Time)
• Maintenance and repairment of squid fishing robots from SANMEI and HAMADE. • PCB repairment, component fault detection and replacement.Key Achievements: 12+ repaired machines per week.